| ¡ | To re-design and refurbish an existing small marina in West Java. |
| ¡ | To provide project and on-site management for the related work. |
| ¡ | To develop a conceptual design for the layout of a 300 berth marina, related facilities and sea defences, at the same site. |
| ¡ | To co-ordinate all surveys and final design |
| ¡ | To refurbish and re-design the adjacent existing slipway to accommodate yachts of 25 tons, including design of all workshop facilities. |
| ¡ | To propose various future management scenarios |
| ¡ | To project manage the new construction of a 100 feet sailing schooner, to be built for the development company in a local boat building yard. |
| ¡ | To provide operational management for the above vessel and other vessels owned by the development group. |
